Bookmark and Share

Refrigeration Field Spray PU Foam

Refrigeration Field Spray PU Foam

Refrigeration Field Application  

Spray Polyurethane Foam Sealant

 

Technical Information:

Items

Result

Foam Density

15-30 kg/m3

Surface Curing Time(23±2℃,50±5%RH)

≤10minutes

Full Curing Time(23±2℃,50±5%RH)

60minutes

Thermal Conductivity W(m.K)(35℃)

≤0.04

Size Stability(23±2℃,48h,%)

≤5

Tensile bond strength(KPa)

Aluminium board- Aluminium board 7days under standard condition

≥100

Shear strength(KPa)

≥180

Compressive strength(KPa)

≥50

Foam multiples(multiple)

50~60

Operation Temperature

5~35℃

Temperature Tolerance after curing

-30~+80℃

Shelf Life

12 months

     

 

     Warning:

1. The normal application temperature for the can is 5℃~ 40℃, the best application temperature is 18℃~ 25℃. The temperature can affect the foaming quantity. When the temperature is excessively low, the foam quantity will be less. Therefore under low temperature, put the can under 30℃~ 40℃ for 30 minutes, or warm the can under the water with temperature 40℃, then use.

2. Use up in one time, if not be used up, keep the gun on the can, close the flux controller to avoid air entering that makes the foam dry and damage the gun. Put the can under cool and aeration condition, or clean the gun and valve by foam cleaner. It can be stored for a long time.

 

Storage and Packing:

1. Store the product in aeration warehouse under temperature 15-35℃,keep far away from the heat, fire and flammable goods. Inversion and throw is strictly prohibited. It can not be piled more than 5 layers The shelf time is 12 month from the date of production. It is available to use based on passing of the test if beyond the shelf life. 

2. Packing: 300ml/pc, 500ml/pc, 750ml/pc,1500ml/pc.